Synchronizing references

Note    This topic refers to all of the application links described in the this chapter except the Lotus Notes link.

The references that are created by Meridian to manage the external references of a document can be synchronized from the document. This is valuable to keep the Meridian references synchronized when external references are added or deleted in the document's native application. It is also necessary when external references are added to the vault by methods that bypass the native application. Reference detection and management is primarily performed by the Meridian application link from within the native application. It is also performed by the Meridian import tools. But if the link is not loaded in the native application or documents with references are imported to the vault without using the Meridian import tools, the external references are not detected and Meridian references are not automatically created. In that case, synchronization must be performed manually.

Meridian references are created and synchronized in the following ways:

It is important to recognize that Meridian references are not created in the following ways:

To manually synchronize Meridian references of a document:

Or

Note    With some versions of AutoCAD, synchronizing references with some AutoCAD files (sheet set files, for example) from within PowerUser while the file is open in AutoCAD can produce an error. First close the file in AutoCAD or synchronize the file from within AutoCAD instead.

Related concepts

Understanding document references

Working with references

Related tasks

Duplicating references

Creating a reference

Viewing references

Using the Reference Explorer


Copyright © 2000-2013 BlueCielo ECM Solutions

www.bluecieloecm.com